Interior Finish-outs / Rehabs

Interior finish-outs involve the final stages of construction that transform a building’s interior from a raw or unfinished state into a completed and functional space. This process can apply to various types of structures.

1. Demolition and Preparation:

  • Clear out any existing fixtures, debris, and unwanted materials from the space.
  • Address any necessary structural repairs or modifications before beginning the finishing process.

2. Framing and Drywall Installation:

  • Construct or modify interior walls, partitions, and ceilings as needed.
  • Install drywall to create a smooth and even surface for painting or other finishes.

3. Electrical and Plumbing Work:

  • Install or modify electrical wiring, outlets, switches, and fixtures according to the design and functional requirements.
  • Address plumbing needs, including sinks, toilets, showers, and other fixtures.

4. HVAC Installation:

  • Install heating, ventilation, and air conditioning systems to regulate temperature and air quality.

5. Insulation

  • Apply insulation materials to walls, ceilings, and floors to improve energy efficiency and comfort.

6. Flooring and Ceiling Finishes:

  • Install flooring materials like hardwood, tile, carpet, or laminate.
  • Apply finishes to ceilings, such as paint, tiles, or paneling.

7. Painting and Wall Finishes:

  • Paint walls, trim, and other surfaces according to the chosen color scheme.
  • Apply any specialized wall finishes, such as wallpaper, texture, or decorative treatments.

8. Cabinetry and Millwork:

  • Install built-in cabinets, shelves, and other custom millwork to provide storage and functional elements.

9. Fixture and Appliance Installation:

  • Place and connect light fixtures, faucets, sinks, appliances, and other fixtures according to the design plan.

10. Final Touches and Details:

  • Install hardware, such as doorknobs, handles, and other finishing touches.
  • Address any remaining punch list items, which are small details or corrections that need to be completed before final approval.

11. Punch List and Final Touches:

  • After inspections, any remaining tasks or corrections will be addressed. This could involve minor touch-ups, adjustments, or installations.

12. Handover and Occupancy:

  • Once all inspections and approvals are obtained, the finished space can be handed over to the owner for use and enjoyment.

Keep in mind that the specific steps and order of operations may vary depending on the type of project and the design preferences of the owner. Each project is unique. Direct Steel and Construction is exceptionally qualified to adapt these steps to suit your specific needs and circumstances.